| Type | work | bureau |
|---|
| Year / years | 1998 | 1888 |
|---|
| Place | Beirut, Beirut Governorate, Lebanon | London, England, United Kingdom |
|---|
| Place context | Beirut, Beirut Governorate, Lebanon | Representative site: Holy Island, Holy Island, United Kingdom |
|---|
| Climate | 19°C · 13.2h daylight · 9 km/h wind | 10°C · 14.6h daylight · 20 km/h wind · via Lindisfarne Castle |
|---|
| Focus | Nightclub | 102 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Lindisfarne Castle
- Renishaw Hall
- Deanery Garden
- Overstrand Hall
|
|---|
| Typologies | - nightclub
- entertainment venue
- adaptive reuse
| - building
- house
- landscape
- civic building
- infrastructure
- hospitality
- church
- sacred space
|
|---|
| Materials | - concrete
- steel
- mirrored surfaces
| |
|---|
| Carbon signals | Concrete, Steel, and Mirrored Surfaces look like the main embodied-carbon drivers in the current palette. - Concrete
- Steel
- Mirrored Surfaces
| Brick, Glass, and Stone look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Use classification and product-level EPD research to place this material more precisely.
| - Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
- Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
|
|---|
| Accessibility | Publicly accessible | 30 of 30 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|