saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Scottish Parliament Building in City of Edinburgh, United Kingdom
Scottish Parliament Building

1999-2004 · Edinburgh, Scotland, United Kingdom

Scottish Parliament Building image

Home of the Scottish Parliament at Holyrood, Edinburgh

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Scottish Parliament Building

Edinburgh, Scotland, United Kingdom · Exact work coordinates

OpenStreetMap

Scottish Parliament Building

Hero image

Home of the Scottish Parliament at Holyrood, Edinburgh

Credit:

Rights: Unknown · unknown

Field
Scottish Parliament BuildingScottish Parliament Building

1999-2004 · Edinburgh, Scotland, United Kingdom

EAA - Emre Arolat ArchitectureEAA - Emre Arolat Architecture

Büyükçekmece, İstanbul

Typeworkbureau
Year / years1999-2004Unrecorded
PlaceEdinburgh, Scotland, United KingdomBüyükçekmece, İstanbul
Place contextEdinburgh, Scotland, United KingdomRepresentative site: Büyükçekmece, İstanbul
Climate10°C · 14.6h daylight · 16 km/h windClimate unavailable · via Sancaklar Mosque
FocusGovernment building5 works in corpus
Architects
  • Benedetta Tagliabue
  • Enric Miralles
  • Emre Arolat
Linked context

Bureaus

  • EMBT
  • EMBT Architects

Notable works

  • Sancaklar Mosque
  • Sancaklar Mosque
  • Vıcem Bodrum Resıdences
  • Zorlu Center / EAA - Emre Arolat Architecture + Tabanlioglu Architects
Typologies
  • government building
  • civic building
  • mosque
  • religious building
  • landscape building
  • religious
  • worship
  • dabas
  • 3d modelling
  • residential
Materials

Not recorded yet.

  • stone
  • concrete
  • steel
  • wood
Carbon signals

government building and civic building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Stone look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.