saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Serralves in Lordelo do Ouro e Massarelos, Portugal
Serralves

1944 · Lordelo do Ouro e Massarelos, Lordelo do Ouro e Massarelos, Portugal

Serralves image

Cultural institution in Porto, Portugal

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Serralves

Lordelo do Ouro e Massarelos, Lordelo do Ouro e Massarelos, Portugal · Exact work coordinates

OpenStreetMap
Field
SerralvesSerralves

1944 · Lordelo do Ouro e Massarelos, Lordelo do Ouro e Massarelos, Portugal

Douglas Cardinal ArchitectDouglas Cardinal Architect

1964 · Ottawa, Ontario, Canada

Typeworkbureau
Year / years19441964
PlaceLordelo do Ouro e Massarelos, Lordelo do Ouro e Massarelos, PortugalOttawa, Ontario, Canada
Place contextLordelo do Ouro e Massarelos, Lordelo do Ouro e Massarelos, PortugalRepresentative site: Gatineau, Gatineau, Canada
Climate17°C · 13.6h daylight · 14 km/h wind4°C · 13.8h daylight · 15 km/h wind · via Canadian Museum of History
FocusMuseum3 works in corpus
Architects
  • Jose Marques da Silva
  • Douglas Cardinal
Linked context

Bureaus

  • José Marques da Silva

Notable works

  • Canadian Museum of History
  • Telus World of Science Edmonton
  • National Museum of the American Indian
Typologies
  • museum
  • landscape
  • museum
  • house
  • performance venue
  • landscape
Materials

Not recorded yet.

  • timber
Carbon signals

museum and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

The recorded material palette leans lower-carbon on paper, but procurement and quantity still matter.

No dominant drivers yet.

Lower-carbon levers

No levers surfaced yet.

  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible3 of 3 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.