saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
CCTV Headquarters

2012 · Beijing, Beijing, China

Beijing, Beijing, China

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

No coordinates are recorded for the current selection yet.

CCTV Headquarters

Image 1

Beijing, Beijing, China

Climate: Climate unavailable

Mapping: Coordinates not recorded

Field
CCTV HeadquartersCCTV Headquarters

2012 · Beijing, Beijing, China

Douglas Cardinal ArchitectDouglas Cardinal Architect

1964 · Ottawa, Ontario, Canada

Typeworkbureau
Year / years20121964
PlaceBeijing, Beijing, ChinaOttawa, Ontario, Canada
Place contextBeijing, Beijing, ChinaRepresentative site: Gatineau, Gatineau, Canada
ClimateClimate unavailable-1°C · 13.8h daylight · 9 km/h wind · via Canadian Museum of History
FocusOffice tower3 works in corpus
Architects

No architects linked yet.

  • Douglas Cardinal
Linked context

Bureaus

No linked context yet.

Notable works

  • Canadian Museum of History
  • Telus World of Science Edmonton
  • National Museum of the American Indian
Typologies
  • office building
  • headquarters
  • high-rise
  • museum
  • house
  • performance venue
  • landscape
Materials
  • steel
  • glass
  • timber
Carbon signals

Steel and Glass look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass

The recorded material palette leans lower-carbon on paper, but procurement and quantity still matter.

No dominant drivers yet.

Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible3 of 3 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.