saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Express Towers in Mumbai, India
Express Towers

1972 · Mumbai, Mumbai, India

Express Towers image

25-storey building in Mumbai, India

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Express Towers

Mumbai, Mumbai, India · Exact work coordinates

OpenStreetMap
Field
Express TowersExpress Towers

1972 · Mumbai, Mumbai, India

Dominique Perrault ArchitectureDominique Perrault Architecture

Albi, Midi-Pyrénées, France

Typeworkbureau
Year / years1972Unrecorded
PlaceMumbai, Mumbai, IndiaAlbi, Midi-Pyrénées, France
Place contextMumbai, Mumbai, IndiaRepresentative site: 16th arrondissement of Paris, 16th arrondissement of Paris, France
Climate30°C · 12.7h daylight · 11 km/h wind12°C · 14.0h daylight · 14 km/h wind · via Longchamp Racecourse
FocusArchitecture12 works in corpus
Architects
  • Joseph Allen Stein
  • Dominique Perrault
Linked context

Bureaus

  • Joseph Allen Stein

Notable works

  • Longchamp Racecourse
  • Tour Landscape
  • Telekom Center Athens
  • Velodrom (Berlin)
Typologies
  • tower
  • building
  • tower
  • office
  • hospitality
  • sports venue
  • landscape
  • infrastructure
  • cultural
Materials
  • stone
  • glass
  • steel
  • concrete
Carbon signals

Stone look like the main embodied-carbon drivers in the current palette.

  • Stone

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.