| Type | work | bureau |
|---|
| Year / years | 1996 | Unrecorded |
|---|
| Place | Vals, Graubunden, Switzerland | Phoenix, Arizona, United States |
|---|
| Place context | Vals, Graubunden, Switzerland | Representative site: Phoenix, Arizona, United States |
|---|
| Climate | 12°C · 13.9h daylight · 11 km/h wind | Climate unavailable · via Betty Fairfax High School |
|---|
| Focus | Thermal baths | 1 works in corpus |
|---|
| Architects | | No architects linked yet. |
|---|
| Linked context | Bureaus | Notable works - Betty Fairfax High School
|
|---|
| Typologies | - bathhouse
- hospitality
- landscape
| - educational
- schools
- high school
|
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete, Quartzite, and Water look like the main embodied-carbon drivers in the current palette. | educational, schools, and high school gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Use classification and product-level EPD research to place this material more precisely.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | Access not recorded across linked works |
|---|
| Related books | | No linked books yet. |
|---|