| Type | work | bureau |
|---|
| Year / years | 2019 | Unrecorded |
|---|
| Place | Genoa, Genoa, Italy | Phoenix, Arizona, United States |
|---|
| Place context | Genoa, Genoa, Italy | Representative site: Phoenix, Arizona, United States |
|---|
| Climate | 17°C · 13.7h daylight · 4 km/h wind | Climate unavailable · via Betty Fairfax High School |
|---|
| Focus | Architecture | 1 works in corpus |
|---|
| Architects | | No architects linked yet. |
|---|
| Linked context | Bureaus - Renzo Piano Building Workshop
| Notable works - Betty Fairfax High School
|
|---|
| Typologies | | - educational
- schools
- high school
|
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete and Steel look like the main embodied-carbon drivers in the current palette. | educational, schools, and high school gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
| No levers surfaced yet. |
|---|
| Accessibility | Access not recorded | Access not recorded across linked works |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|