saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

31 Building in Seoul, South Korea
31 Building

1970 · Seoul, Seoul, South Korea

31 Building image

Seed wave 36 image for 31 Building.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

31 Building

Seoul, Seoul, South Korea · Exact work coordinates

OpenStreetMap
Field
31 Building31 Building

1970 · Seoul, Seoul, South Korea

DLR Group

Phoenix, Arizona, United States

Typeworkbureau
Year / years1970Unrecorded
PlaceSeoul, Seoul, South KoreaPhoenix, Arizona, United States
Place contextSeoul, Seoul, South KoreaRepresentative site: Phoenix, Arizona, United States
Climate5°C · 13.4h daylight · 2 km/h windClimate unavailable · via Betty Fairfax High School
FocusOffice building1 works in corpus
Architects
  • Kim Chung-up

No architects linked yet.

Linked context

Bureaus

  • Kim Chung-up

Notable works

  • Betty Fairfax High School
Typologies
  • tower
  • office
  • educational
  • schools
  • high school
Materials
  • concrete
  • steel
  • glass

Not recorded yet.

Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

educational, schools, and high school gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.

No levers surfaced yet.

AccessibilityAccess not recordedAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.