saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Gran Torre Costanera in Santiago, Chile
Gran Torre Costanera

2014 · Santiago, Santiago Metropolitan Region, Chile

Gran Torre Costanera image

Seed wave 38 image for Gran Torre Costanera.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Gran Torre Costanera

Santiago, Santiago Metropolitan Region, Chile · Exact work coordinates

OpenStreetMap
Field
Gran Torre CostaneraGran Torre Costanera

2014 · Santiago, Santiago Metropolitan Region, Chile

Dimitris Pikionis

1925-1968 · Athens, Attica, Greece

Typeworkbureau
Year / years20141925-1968
PlaceSantiago, Santiago Metropolitan Region, ChileAthens, Attica, Greece
Place contextSantiago, Santiago Metropolitan Region, ChileRepresentative site: Athens, Attica, Greece
Climate14°C · 11.1h daylight · 3 km/h wind21°C · 13.4h daylight · 10 km/h wind · via Landscaping of the Acropolis of Athens
FocusOffice tower1 works in corpus
Architects

No architects linked yet.

  • Dimitris Pikionis
Linked context

Bureaus

No linked context yet.

Notable works

  • Landscaping of the Acropolis of Athens
Typologies
  • tower
  • office
  • mixed-use
  • landscape
  • public space
  • pedestrian infrastructure
Materials
  • glass
  • steel
  • concrete
  • stone
  • paving
  • salvaged fragments
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Paving, Salvaged Fragments, and Stone look like the main embodied-carbon drivers in the current palette.

  • Paving
  • Salvaged Fragments
  • Stone
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.