saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Lewis House (Tallahassee, Florida) in Tallahassee, United States
Lewis House (Tallahassee, Florida)

1954 · Tallahassee, Tallahassee, United States

Lewis House (Tallahassee, Florida) image

Historic house in Florida, United States

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Lewis House (Tallahassee, Florida)

Tallahassee, Tallahassee, United States · Exact work coordinates

OpenStreetMap

Lewis House (Tallahassee, Florida)

Hero image

Historic house in Florida, United States

Credit:

Rights: Unknown · unknown

Field
Lewis House (Tallahassee, Florida)Lewis House (Tallahassee, Florida)

1954 · Tallahassee, Tallahassee, United States

Cottinelli TelmoCottinelli Telmo

1920 · Lisbon, Lisbon District, Portugal

Typeworkbureau
Year / years19541920
PlaceTallahassee, Tallahassee, United StatesLisbon, Lisbon District, Portugal
Place contextTallahassee, Tallahassee, United StatesRepresentative site: Belém, Belém, Portugal
Climate28°C · 13.1h daylight · 12 km/h wind17°C · 13.5h daylight · 15 km/h wind · via Monument of the Discoveries
FocusHouse4 works in corpus
Architects
  • Frank Lloyd Wright
  • Cottinelli Telmo
Linked context

Bureaus

  • Frank Lloyd Wright Foundation

Notable works

  • Monument of the Discoveries
  • Campolide railway station
  • Praça do Império
  • Vila Real de Santo António railway station
Typologies
  • house
  • tower
  • building
  • performance venue
  • landscape
Materials
  • concrete
  • stone
  • glass

Not recorded yet.

Carbon signals

Concrete, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
  • Stone

building, performance venue, and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.

No levers surfaced yet.

AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.