saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Guangzhou Opera House

2010 · Guangzhou, Guangdong, China

Guangzhou, Guangdong, China

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

No coordinates are recorded for the current selection yet.

Guangzhou Opera House

Image 1

Guangzhou, Guangdong, China

Climate: Climate unavailable

Mapping: Coordinates not recorded

Field
Guangzhou Opera HouseGuangzhou Opera House

2010 · Guangzhou, Guangdong, China

Charles Correa AssociatesCharles Correa Associates

1958 · Mumbai, Maharashtra, India

Typeworkbureau
Year / years20101958
PlaceGuangzhou, Guangdong, ChinaMumbai, Maharashtra, India
Place contextGuangzhou, Guangdong, ChinaRepresentative site: Pathanamthitta district, Pathanamthitta district, India
ClimateClimate unavailable28°C · 12.4h daylight · 4 km/h wind · via St. Peter and St. Paul's Church, Parumala
FocusOpera house12 works in corpus
Architects

No architects linked yet.

  • Charles Correa
Linked context

Bureaus

No linked context yet.

Notable works

  • St. Peter and St. Paul's Church, Parumala
  • Sabarmati Ashram
  • Gandhi Smarak Sangrahalaya
  • Sardar Vallabhbhai Patel Stadium, Navrangpura
Typologies
  • opera house
  • cultural building
  • performing arts
  • church
  • sacred space
  • building
  • museum
  • cultural building
  • stadium
  • sports building
  • arts center
Materials
  • granite
  • glass
  • steel
  • brick
  • concrete
  • sandstone
  • stone
  • glass
Carbon signals

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone

Concrete, Brick, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick
  • Glass
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible9 of 9 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.