saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Luis Barragán House and Studio

Tacubaya, Tacubaya, Mexico · Exact work coordinates

OpenStreetMap
Field
Luis Barragán House and StudioLuis Barragán House and Studio

1948 · Tacubaya, Tacubaya, Mexico

Cesar Pelli & AssociatesCesar Pelli & Associates

1977 · New Haven, Connecticut, United States

Typeworkbureau
Year / years19481977
PlaceTacubaya, Tacubaya, MexicoNew Haven, Connecticut, United States
Place contextTacubaya, Tacubaya, MexicoRepresentative site: Minneapolis, Minneapolis, United States
Climate13°C · 12.7h daylight · 1 km/h wind14°C · 13.8h daylight · 15 km/h wind · via Minneapolis Central Library
FocusMuseum32 works in corpus
Architects
  • Luis Barragan
  • César Pelli
Linked context

Bureaus

  • Luis Barragan

Notable works

  • Minneapolis Central Library
  • Overture Center for the Arts
  • Ronald Reagan Washington National Airport
  • Pacific Design Center
Typologies
  • museum
  • house
  • library
  • landscape
  • museum
  • gallery
  • house
  • performance venue
  • transport hub
  • building
Materials

Not recorded yet.

  • glass
  • timber
  • steel
  • concrete
  • stone
Carbon signals

museum and house gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible14 of 14 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.