saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Asahikawa Station in Asahikawa, Japan
Asahikawa Station

1898 · Asahikawa, Asahikawa, Japan

Asahikawa Station image

Railway station in Asahikawa, Hokkaido, Japan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Asahikawa Station

Asahikawa, Asahikawa, Japan · Exact work coordinates

OpenStreetMap
Field
Asahikawa StationAsahikawa Station

1898 · Asahikawa, Asahikawa, Japan

Boris MagasBoris Magas

1960-2013 · Zagreb, City of Zagreb, Croatia

Typeworkbureau
Year / years18981960-2013
PlaceAsahikawa, Asahikawa, JapanZagreb, City of Zagreb, Croatia
Place contextAsahikawa, Asahikawa, JapanRepresentative site: Malinska – Dubašnica, Malinska – Dubašnica, Croatia
Climate9°C · 13.7h daylight · 11 km/h wind20°C · 13.8h daylight · 15 km/h wind · via Haludovo Palace Hotel
FocusPerformance venue2 works in corpus
Architects
  • Hiroshi Naito
  • Boris Magas
Linked context

Bureaus

  • Hiroshi Naito Architect & Associates

Notable works

  • Haludovo Palace Hotel
  • Stadion Poljud
Typologies
  • performance venue
  • house
  • hospitality
  • stadium
  • sports architecture
  • civic infrastructure
Materials

Not recorded yet.

  • concrete
  • steel
Carbon signals

performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.