saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

The Tsentrosoyuz Building in Krasnoselsky District, Russia
The Tsentrosoyuz Building

1928 · Krasnoselsky District, Krasnoselsky District, Russia

The Tsentrosoyuz Building image

Building of Myasnitskaya Street, Russia

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

The Tsentrosoyuz Building

Krasnoselsky District, Krasnoselsky District, Russia · Exact work coordinates

OpenStreetMap
Field
The Tsentrosoyuz BuildingThe Tsentrosoyuz Building

1928 · Krasnoselsky District, Krasnoselsky District, Russia

Bjarke Ingels GroupBjarke Ingels Group

Copenhagen, Capital Region of Denmark, Denmark

Typeworkbureau
Year / years1928Unrecorded
PlaceKrasnoselsky District, Krasnoselsky District, RussiaCopenhagen, Capital Region of Denmark, Denmark
Place contextKrasnoselsky District, Krasnoselsky District, RussiaRepresentative site: Copenhagen, Capital Region of Denmark, Denmark
Climate5°C · 14.5h daylight · 14 km/h wind11°C · 14.5h daylight · 24 km/h wind · via Copenhagen Harbour Bath / BIG + JDS
FocusPerformance venue6 works in corpus
Architects
  • Le Corbusier
  • Bjarke Ingels
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Copenhagen Harbour Bath / BIG + JDS
  • VM Houses / BIG + JDS
  • Denmark Pavilion, Shanghai Expo 2010 / BIG
  • Sluishuis
Typologies
  • performance venue
  • office
  • sports
  • recreation training
  • swimming pool
  • wood
  • public facilities
  • residential
  • housing
  • apartments
Materials

Not recorded yet.

  • wood
  • glass
  • concrete
Carbon signals

performance venue and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.