saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

International Museum of the Baroque

Puebla, Puebla, Mexico · Exact work coordinates

OpenStreetMap
Field
International Museum of the BaroqueInternational Museum of the Baroque

2014 · Puebla, Puebla, Mexico

Bjarke Ingels GroupBjarke Ingels Group

Copenhagen, Capital Region of Denmark, Denmark

Typeworkbureau
Year / years2014Unrecorded
PlacePuebla, Puebla, MexicoCopenhagen, Capital Region of Denmark, Denmark
Place contextPuebla, Puebla, MexicoRepresentative site: Copenhagen, Capital Region of Denmark, Denmark
Climate22°C · 12.7h daylight · 11 km/h wind6°C · 14.6h daylight · 10 km/h wind · via Copenhagen Harbour Bath / BIG + JDS
FocusMuseum6 works in corpus
Architects
  • Toyo Ito
  • Bjarke Ingels
Linked context

Bureaus

  • Toyo Ito & Associates, Architects

Notable works

  • Copenhagen Harbour Bath / BIG + JDS
  • VM Houses / BIG + JDS
  • Denmark Pavilion, Shanghai Expo 2010 / BIG
  • Sluishuis
Typologies
  • museum
  • sports
  • recreation training
  • swimming pool
  • wood
  • public facilities
  • residential
  • housing
  • apartments
Materials

Not recorded yet.

  • wood
  • glass
  • concrete
Carbon signals

museum gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.