saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
CURE Children's Hospital of Uganda

2000 · Mbale, Eastern Region, Uganda

Mbale, Eastern Region, Uganda

26°C · 12.1h daylight · 3 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

CURE Children's Hospital of Uganda

Mbale, Eastern Region, Uganda · Exact work coordinates

OpenStreetMap

CURE Children's Hospital of Uganda

Image 1

Mbale, Eastern Region, Uganda

Climate: 26°C · 12.1h daylight · 3 km/h wind

Mapping: Exact work coordinates

Field
CURE Children's Hospital of Uganda

2000 · Mbale, Eastern Region, Uganda

Bjarke Ingels GroupBjarke Ingels Group

Copenhagen, Capital Region of Denmark, Denmark

Typeworkbureau
Year / years2000Unrecorded
PlaceMbale, Eastern Region, UgandaCopenhagen, Capital Region of Denmark, Denmark
Place contextMbale, Eastern Region, UgandaRepresentative site: Copenhagen, Capital Region of Denmark, Denmark
Climate26°C · 12.1h daylight · 3 km/h wind7°C · 14.5h daylight · 20 km/h wind · via Copenhagen Harbour Bath / BIG + JDS
FocusChildren's hospital6 works in corpus
Architects

No architects linked yet.

  • Bjarke Ingels
Linked context

Bureaus

No linked context yet.

Notable works

  • Copenhagen Harbour Bath / BIG + JDS
  • VM Houses / BIG + JDS
  • Denmark Pavilion, Shanghai Expo 2010 / BIG
  • Sluishuis
Typologies
  • hospital
  • healthcare
  • teaching hospital
  • sports
  • recreation training
  • swimming pool
  • wood
  • public facilities
  • residential
  • housing
  • apartments
Materials
  • concrete
  • masonry
  • wood
  • glass
  • concrete
Carbon signals

Concrete and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPrivate or restricted1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.