saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

St. Paul's Church, Bern in Bern, Switzerland
St. Paul's Church, Bern

1905 · Bern, Bern, Switzerland

St. Paul's Church, Bern image

Church in Bern, Switzerland

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

St. Paul's Church, Bern

Bern, Bern, Switzerland · Exact work coordinates

OpenStreetMap
Field
St. Paul's Church, BernSt. Paul's Church, Bern

1905 · Bern, Bern, Switzerland

Bernard Tschumi ArchitectsBernard Tschumi Architects

Athens, Attica, Greece

Typeworkbureau
Year / years1905Unrecorded
PlaceBern, Bern, SwitzerlandAthens, Attica, Greece
Place contextBern, Bern, SwitzerlandRepresentative site: Athens, Attica, Greece
Climate13°C · 13.8h daylight · 8 km/h wind16°C · 13.3h daylight · 1 km/h wind · via Acropolis Museum
FocusSacred building3 works in corpus
Architects
  • Karl Moser
  • Bernard Tschumi
Linked context

Bureaus

  • Karl Moser

Notable works

  • Acropolis Museum
  • New Acropolis Museum
  • Railway Footbridge at Roche-sur-Yon / Bernard Tschumi Architects + HDA
Typologies
  • church
  • sacred space
  • tower
  • museum
  • archaeology museum
  • cultural building
  • cultural
  • museums exhibit
  • museums and libraries
  • infrastructure
  • bridges
Materials
  • glass
  • glass
  • concrete
  • marble
  • steel
Carbon signals

Glass look like the main embodied-carbon drivers in the current palette.

  • Glass

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.