saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Ibirapuera Park in São Paulo, Brazil
Ibirapuera Park

1954 · São Paulo, São Paulo, Brazil

Ibirapuera Park image

Urban park in São Paulo

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Ibirapuera Park

São Paulo, São Paulo, Brazil · Exact work coordinates

OpenStreetMap
Field
Ibirapuera ParkIbirapuera Park

1954 · São Paulo, São Paulo, Brazil

Ateliers Jean NouvelAteliers Jean Nouvel

1994 · Paris, Ile-de-France, France

Typeworkbureau
Year / years19541994
PlaceSão Paulo, São Paulo, BrazilParis, Ile-de-France, France
Place contextSão Paulo, São Paulo, BrazilRepresentative site: Lyon, Lyon, France
Climate24°C · 11.4h daylight · 9 km/h wind19°C · 13.8h daylight · 16 km/h wind · via Opéra de Lyon
FocusLandscape project29 works in corpus
Architects
  • Oscar Niemeyer
  • Jean Nouvel
Linked context

Bureaus

  • Oscar Niemeyer

Notable works

  • Opéra de Lyon
  • Guthrie Theater
  • Institut du Monde Arabe
  • Golden Angel
Typologies
  • landscape
  • house
  • performance venue
  • cultural center
  • institutional building
  • museum
  • building
  • tower
  • office
Materials

Not recorded yet.

  • glass
  • steel
  • aluminum
  • concrete
  • brick
  • glass-fiber reinforced concrete
Carbon signals

landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Aluminum, Concrete, and Concrete look like the main embodied-carbon drivers in the current palette.

  • Aluminum
  • Concrete
  • Concrete
Lower-carbon levers

No levers surfaced yet.

  • Focus on recycled content, lighter assemblies, and careful facade-specification choices.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
AccessibilityPublicly accessible8 of 8 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.