saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Futuna Chapel in Wellington, New Zealand
Futuna Chapel

1961 · Wellington, Wellington, New Zealand

Futuna Chapel image

Seed wave 58 image for Futuna Chapel.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Futuna Chapel

Wellington, Wellington, New Zealand · Exact work coordinates

OpenStreetMap
Field
Futuna ChapelFutuna Chapel

1961 · Wellington, Wellington, New Zealand

Atelier Tomás TaveiraAtelier Tomás Taveira

1966 · Lisbon, Lisbon District, Portugal

Typeworkbureau
Year / years19611966
PlaceWellington, Wellington, New ZealandLisbon, Lisbon District, Portugal
Place contextWellington, Wellington, New ZealandRepresentative site: Leiria, Leiria, Portugal
Climate11°C · 10.8h daylight · 68 km/h wind16°C · 13.5h daylight · 0 km/h wind · via Estádio Dr. Magalhães Pessoa
FocusChapel4 works in corpus
Architects
  • John Scott
  • Tomas Taveira
Linked context

Bureaus

  • John Scott

Notable works

  • Estádio Dr. Magalhães Pessoa
  • Estádio José Alvalade
  • Estádio Municipal de Aveiro
  • Alfragide Towers
Typologies
  • chapel
  • religious building
  • modernism
  • sports venue
  • housing
  • tower
  • landscape
Materials
  • concrete
  • timber

Not recorded yet.

Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

sports venue, housing, tower, and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.

No levers surfaced yet.

AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.