saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

The Imperial (Mumbai) in Mumbai, India
The Imperial (Mumbai)

2010 · Mumbai, Mumbai, India

The Imperial (Mumbai) image

Residential complex in Mumbai

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

The Imperial (Mumbai)

Mumbai, Mumbai, India · Exact work coordinates

OpenStreetMap
Field
The Imperial (Mumbai)The Imperial (Mumbai)

2010 · Mumbai, Mumbai, India

Atelier Peter Zumthor

1979 · Haldenstein, Graubunden, Switzerland

Typeworkbureau
Year / years20101979
PlaceMumbai, Mumbai, IndiaHaldenstein, Graubunden, Switzerland
Place contextMumbai, Mumbai, IndiaRepresentative site: Vals, Graubunden, Switzerland
Climate28°C · 12.7h daylight · 7 km/h wind3°C · 13.9h daylight · 3 km/h wind · via Therme Vals
FocusLandscape project2 works in corpus
Architects
  • Hafeez Contractor
  • Peter Zumthor
Linked context

Bureaus

  • Architect Hafeez Contractor

Notable works

  • Therme Vals
  • Bruder Klaus Field Chapel
Typologies
  • tower
  • landscape
  • bathhouse
  • hospitality
  • landscape
  • chapel
  • religious building
Materials

Not recorded yet.

  • quartzite
  • concrete
  • water
  • rammed concrete
  • timber
Carbon signals

tower and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Concrete, and Quartzite look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Concrete
  • Quartzite
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Use classification and product-level EPD research to place this material more precisely.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.