| Type | work | bureau |
|---|
| Year / years | 1991 | 1979 |
|---|
| Place | California, California, United States | Haldenstein, Graubunden, Switzerland |
|---|
| Place context | Broadway, Banker's Hill, Core-Columbia, San Diego, California, United States | Representative site: Poststrasse, Brücke, Vals, Graubünden/Grischun/Grigioni, Schweiz/Suisse/Svizzera/Svizra |
|---|
| Climate | 21°C · 13.0h daylight · 15 km/h wind | 5°C · 13.5h daylight · 2 km/h wind · via Therme Vals |
|---|
| Focus | Architecture | 2 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Therme Vals
- Bruder Klaus Field Chapel
|
|---|
| Typologies | | - bathhouse
- hospitality
- landscape
- chapel
- religious building
|
|---|
| Materials | Not recorded yet. | - quartzite
- concrete
- water
- rammed concrete
- timber
|
|---|
| Carbon signals | tower gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete, Concrete, and Quartzite look like the main embodied-carbon drivers in the current palette. - Concrete
- Concrete
- Quartzite
|
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Use classification and product-level EPD research to place this material more precisely.
- Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
|
|---|
| Accessibility | Access not recorded | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | |
|---|