saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Inalpi Arena in Turin, Italy
Inalpi Arena

2003 · Turin, Turin, Italy

Inalpi Arena image

Indoor arena in Turin, Italy

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Inalpi Arena

Turin, Turin, Italy · Exact work coordinates

OpenStreetMap
Field
Inalpi ArenaInalpi Arena

2003 · Turin, Turin, Italy

Arthur Erickson ArchitectsArthur Erickson Architects

1963 · Vancouver, British Columbia, Canada

Typeworkbureau
Year / years20031963
PlaceTurin, Turin, ItalyVancouver, British Columbia, Canada
Place contextTurin, Turin, ItalyRepresentative site: Vancouver, Vancouver, Canada
Climate13°C · 13.8h daylight · 2 km/h wind12°C · 14.0h daylight · 12 km/h wind · via Museum of Anthropology at UBC
FocusPerformance venue14 works in corpus
Architects
  • Arata Isozaki
  • Arthur Erickson
Linked context

Bureaus

  • Arata Isozaki & Associates

Notable works

  • Museum of Anthropology at UBC
  • Cedarvale station
  • Yorkdale station
  • 1 Cal Plaza
Typologies
  • performance venue
  • landscape
  • museum
  • education
  • campus building
  • house
  • performance venue
  • building
  • civic building
  • landscape
Materials

Not recorded yet.

  • brick
  • glass
Carbon signals

performance venue and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Brick and Glass look like the main embodied-carbon drivers in the current palette.

  • Brick
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible8 of 8 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.