saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Estádio do Morumbi in Morumbi, Brazil
Estádio do Morumbi

1960 · Morumbi, Morumbi, Brazil

Estádio do Morumbi image

Football stadium in Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Estádio do Morumbi

Morumbi, Morumbi, Brazil · Exact work coordinates

OpenStreetMap
Field
Estádio do MorumbiEstádio do Morumbi

1960 · Morumbi, Morumbi, Brazil

Arthur Erickson ArchitectsArthur Erickson Architects

1963 · Vancouver, British Columbia, Canada

Typeworkbureau
Year / years19601963
PlaceMorumbi, Morumbi, BrazilVancouver, British Columbia, Canada
Place contextMorumbi, Morumbi, BrazilRepresentative site: Vancouver, Vancouver, Canada
Climate15°C · 11.4h daylight · 6 km/h wind12°C · 14.1h daylight · 10 km/h wind · via Museum of Anthropology at UBC
FocusArchitecture14 works in corpus
Architects
  • Joao Batista Vilanova Artigas
  • Arthur Erickson
Linked context

Bureaus

  • Vilanova Artigas

Notable works

  • Museum of Anthropology at UBC
  • Cedarvale station
  • Yorkdale station
  • 1 Cal Plaza
Typologies
  • sports venue
  • museum
  • education
  • campus building
  • house
  • performance venue
  • building
  • civic building
  • landscape
Materials

Not recorded yet.

  • brick
  • glass
Carbon signals

sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Brick and Glass look like the main embodied-carbon drivers in the current palette.

  • Brick
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded8 of 8 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.