| Type | work | bureau |
|---|
| Year / years | 2013 | 1927-1971 |
|---|
| Place | Miami, Florida, United States | Copenhagen, Capital Region of Denmark, Denmark |
|---|
| Place context | Miami, Florida, United States | Representative site: Gentofte Municipality, Gentofte Municipality, Denmark |
|---|
| Climate | 21°C · 12.9h daylight · 7 km/h wind | 10°C · 14.6h daylight · 25 km/h wind · via Rothenborg House |
|---|
| Focus | Museum | 12 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Rothenborg House
- Bellavista housing estate
- Bellevue Teatret
- Skovshoved Petrol Station
|
|---|
| Typologies | - museum
- art museum
- waterfront building
| - house
- housing
- performance venue
- theatre
- office
- civic building
- city hall
- building
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Glass look like the main embodied-carbon drivers in the current palette. | Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Publicly accessible | 4 of 4 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|