saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Genoa-Saint George Bridge in Genoa, Italy
Genoa-Saint George Bridge

2019 · Genoa, Genoa, Italy

Genoa-Saint George Bridge image

Motorway viaduct in Genoa, Italy

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Genoa-Saint George Bridge

Genoa, Genoa, Italy · Exact work coordinates

OpenStreetMap
Field
Genoa-Saint George BridgeGenoa-Saint George Bridge

2019 · Genoa, Genoa, Italy

Arne JacobsenArne Jacobsen

1927-1971 · Copenhagen, Capital Region of Denmark, Denmark

Typeworkbureau
Year / years20191927-1971
PlaceGenoa, Genoa, ItalyCopenhagen, Capital Region of Denmark, Denmark
Place contextGenoa, Genoa, ItalyRepresentative site: Gentofte Municipality, Gentofte Municipality, Denmark
Climate15°C · 13.8h daylight · 9 km/h wind7°C · 14.7h daylight · 12 km/h wind · via Rothenborg House
FocusArchitecture12 works in corpus
Architects
  • Renzo Piano
  • Arne Jacobsen
Linked context

Bureaus

  • Renzo Piano Building Workshop

Notable works

  • Rothenborg House
  • Bellavista housing estate
  • Bellevue Teatret
  • Skovshoved Petrol Station
Typologies
  • infrastructure
  • house
  • housing
  • performance venue
  • theatre
  • office
  • civic building
  • city hall
  • building
Materials
  • concrete
  • steel
  • concrete
  • brick
  • steel
  • glass
Carbon signals

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel

Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Brick
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded4 of 4 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.