saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Crown Prince Bridge in Bezirk Mitte, Germany
Crown Prince Bridge

1996 · Bezirk Mitte, Bezirk Mitte, Germany

Crown Prince Bridge image

Bridge in Berlin, quarters of Tiergarten and Mitte

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Crown Prince Bridge

Bezirk Mitte, Bezirk Mitte, Germany · Exact work coordinates

OpenStreetMap
Field
Crown Prince BridgeCrown Prince Bridge

1996 · Bezirk Mitte, Bezirk Mitte, Germany

Architecture-Studio

1973 · Paris, Ile-de-France, France

Typeworkbureau
Year / years19961973
PlaceBezirk Mitte, Bezirk Mitte, GermanyParis, Ile-de-France, France
Place contextBezirk Mitte, Bezirk Mitte, GermanyRepresentative site: Athens, Attica, Greece
Climate6°C · 14.3h daylight · 13 km/h wind16°C · 13.4h daylight · 2 km/h wind · via Onassis Stegi
FocusCivic building1 works in corpus
Architects
  • Santiago Calatrava

No architects linked yet.

Linked context

Bureaus

  • Santiago Calatrava

Notable works

  • Onassis Stegi
Typologies
  • infrastructure
  • civic building
  • landscape
  • cultural center
  • performing arts venue
  • exhibition space
Materials

Not recorded yet.

  • glass
  • metal
  • stone
Carbon signals

infrastructure, civic building, and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Glass, Metal, and Stone look like the main embodied-carbon drivers in the current palette.

  • Glass
  • Metal
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.