saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Kahlenberg Transmitter

Unknown · Vienna, Vienna, Austria

Vienna, Vienna, Austria

7°C · 14.0h daylight · 18 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Kahlenberg Transmitter

Vienna, Vienna, Austria · Exact work coordinates

OpenStreetMap

Kahlenberg Transmitter

Image 1

Vienna, Vienna, Austria

Climate: 7°C · 14.0h daylight · 18 km/h wind

Mapping: Exact work coordinates

Field
Kahlenberg Transmitter

Unknown · Vienna, Vienna, Austria

Alvar Aalto StudioAlvar Aalto Studio

1923 · Helsinki, Uusimaa, Finland

Typeworkbureau
Year / yearsUnknown1923
PlaceVienna, Vienna, AustriaHelsinki, Uusimaa, Finland
Place contextVienna, Vienna, AustriaRepresentative site: Uppsala Municipality, Uppsala Municipality, Sweden
Climate7°C · 14.0h daylight · 18 km/h wind16°C · 15.1h daylight · 17 km/h wind · via Västmanlands-Dala nation
FocusArchitecture46 works in corpus
Architects
  • Gustav Peichl
  • Alvar Aalto
Linked context

Bureaus

  • Gustav Peichl

Notable works

  • Västmanlands-Dala nation
  • Seinäjoki Civil Guard House
  • Vyborg Library
  • Jyväskylä Defence Corps Building
Typologies
  • tower
  • education
  • campus building
  • house
  • library
  • building
  • church
  • sacred space
  • housing
Materials
  • steel
  • concrete
  • timber
Carbon signals

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded23 of 23 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.