saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

SiemensForum München in Maxvorstadt, Germany
SiemensForum München

1999 · Maxvorstadt, Maxvorstadt, Germany

SiemensForum München image

Image associated with SiemensForum München.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

SiemensForum München

Maxvorstadt, Maxvorstadt, Germany · Exact work coordinates

OpenStreetMap
Field
SiemensForum MünchenSiemensForum München

1999 · Maxvorstadt, Maxvorstadt, Germany

AL_AAL_A

2009 · London, England, United Kingdom

Typeworkbureau
Year / years19992009
PlaceMaxvorstadt, Maxvorstadt, GermanyLondon, England, United Kingdom
Place contextMaxvorstadt, Maxvorstadt, GermanyRepresentative site: Lisbon, Lisbon, Portugal
Climate9°C · 13.9h daylight · 3 km/h wind17°C · 13.4h daylight · 4 km/h wind · via Museum of Art, Architecture and Technology
FocusHouse1 works in corpus
Architects
  • Richard Meier
  • Amanda Levete
Linked context

Bureaus

  • Richard Meier & Partners Architects

Notable works

  • Museum of Art, Architecture and Technology
Typologies
  • house
  • museum
  • cultural building
  • riverfront building
Materials

Not recorded yet.

  • ceramic tile
  • concrete
  • glass
Carbon signals

house gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Ceramic Tile, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Ceramic Tile
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Use classification and product-level EPD research to place this material more precisely.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.