saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Villa Le Lac in Corseaux, Switzerland
Villa Le Lac

1924 · Corseaux, Corseaux, Switzerland

Villa Le Lac image

House by Le Corbusier in Corseaux, Switzerland

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Villa Le Lac

Corseaux, Corseaux, Switzerland · Exact work coordinates

OpenStreetMap
Field
Villa Le LacVilla Le Lac

1924 · Corseaux, Corseaux, Switzerland

Adolf LoosAdolf Loos

1896 · Vienna, Vienna, Austria

Typeworkbureau
Year / years19241896
PlaceCorseaux, Corseaux, SwitzerlandVienna, Vienna, Austria
Place contextCorseaux, Corseaux, SwitzerlandRepresentative site: Innere Stadt, Innere Stadt, Austria
Climate11°C · 13.9h daylight · 16 km/h wind9°C · 14.0h daylight · 7 km/h wind · via Café Museum
FocusHousing5 works in corpus
Architects
  • Le Corbusier
  • Adolf Loos
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Café Museum
  • Looshaus
  • Rufer House
  • Villa Muller
Typologies
  • housing
  • museum
  • housing
  • house
  • villa
  • modernism
Materials

Not recorded yet.

  • stucco
  • concrete
  • timber
Carbon signals

housing gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Stucco look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Stucco
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Use classification and product-level EPD research to place this material more precisely.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.