saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Seoullo 7017 in Seoul, South Korea
Seoullo 7017

2017 · Seoul, Seoul, South Korea

Seoullo 7017 image

Elevated park in Seoul, South Korea

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Seoullo 7017

Seoul, Seoul, South Korea · Exact work coordinates

OpenStreetMap
Field
Seoullo 7017Seoullo 7017

2017 · Seoul, Seoul, South Korea

Adolf LoosAdolf Loos

1896 · Vienna, Vienna, Austria

Typeworkbureau
Year / years20171896
PlaceSeoul, Seoul, South KoreaVienna, Vienna, Austria
Place context서울로 7017, 회현동, 서울특별시, 대한민국Representative site: Operngasse, Innere Stadt, Katastralgemeinde Innere Stadt, Wien, Österreich
Climate13°C · 13.5h daylight · 5 km/h wind19°C · 14.1h daylight · 21 km/h wind · via Café Museum
FocusLandscape project5 works in corpus
Architects
  • Winy Maas
  • Adolf Loos
Linked context

Bureaus

  • MVRDV

Notable works

  • Café Museum
  • Looshaus
  • Rufer House
  • Villa Muller
Typologies
  • landscape
  • museum
  • housing
  • house
  • villa
  • modernism
Materials

Not recorded yet.

  • stucco
  • concrete
  • timber
Carbon signals

landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Stucco look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Stucco
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Use classification and product-level EPD research to place this material more precisely.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.