saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

DeLaMar in Amsterdam, Netherlands
DeLaMar

1947 · Amsterdam, Amsterdam, Netherlands

DeLaMar image

Theatre in Amsterdam, Netherlands

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

DeLaMar

Amsterdam, Amsterdam, Netherlands · Exact work coordinates

OpenStreetMap
Field
DeLaMarDeLaMar

1947 · Amsterdam, Amsterdam, Netherlands

Adolf LoosAdolf Loos

1896 · Vienna, Vienna, Austria

Typeworkbureau
Year / years19471896
PlaceAmsterdam, Amsterdam, NetherlandsVienna, Vienna, Austria
Place contextAmsterdam, Amsterdam, NetherlandsRepresentative site: Innere Stadt, Innere Stadt, Austria
Climate14°C · 14.3h daylight · 21 km/h wind12°C · 14.0h daylight · 12 km/h wind · via Café Museum
FocusPerformance venue5 works in corpus
Architects
  • Jo Coenen
  • Adolf Loos
Linked context

Bureaus

  • Jo Coenen Architects & Urbanists

Notable works

  • Café Museum
  • Looshaus
  • Rufer House
  • Villa Muller
Typologies
  • performance venue
  • museum
  • housing
  • house
  • villa
  • modernism
Materials

Not recorded yet.

  • stucco
  • concrete
  • timber
Carbon signals

performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Stucco look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Stucco
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Use classification and product-level EPD research to place this material more precisely.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.